查看完整版本: [E文]IEC 61850 ALSO OUTSIDE THE SUBSTATION

cqnike 2008-2-13 12:15

[E文]IEC 61850 ALSO OUTSIDE THE SUBSTATION

2005
Several information models are defined or are under way:
1.Information model for substation and feeder equipment(IEC 61850-7-x)
2.Information model for monitoring and control of wind power plants(IEC 61400-25)
3.Information model for monitoring and control of dis-tributed energy resources(IEC 61850)
4.Information model for monitoring and control of hy-dro power plants(IEC 61850)
5.Information model for power quality monitoring(IEC 61850)
6.Information model of a power system as seen from a control center viewpoint(IEC 61970 CIM–com-
mon information model)

[[i] 本帖最后由 cqnike 于 2008-2-13 12:18 编辑 [/i]]

commzhou 2008-2-19 22:30

:)
页: [1]
查看完整版本: [E文]IEC 61850 ALSO OUTSIDE THE SUBSTATION